Question details
The user needs to know why the NETWORKDAYS formula incorrectly returns 1 instead of 0 when both the start and end dates fall on a Sunday.

- Product
- Spreadsheet
- Device & OS
- not provided
- Scenario
- Calculating the number of working days between two dates when both the start and end dates land on a weekend.
- Observed behavior
- The NETWORKDAYS function unexpectedly returns 1 instead of 0 for a Sunday, typically caused by text-formatted dates, regional settings, or incorrect weekend configurations.
Before troubleshooting the formula, ensure that your start and end dates are formatted as actual date values rather than plain text strings.
Use the DATE Function to Verify Actual Date Values
Ensure the formula processes true date values by using the DATE function rather than referencing potentially text-formatted cells.
The NETWORKDAYS function calculates working days inclusively. For a standard Saturday-Sunday weekend, a Sunday start and end date should return 0. If it returns 1, the spreadsheet might be interpreting the date as text.
Click on the cell where you want the working days calculated.
Type the formula using the DATE function to guarantee correct date formatting. For example: =NETWORKDAYS(DATE(2024,3,3), DATE(2024,3,3)).
Press Enter. Since March 3, 2024 is a Sunday, a standard weekend setting will correctly output 0.

Check Custom Weekend Settings in NETWORKDAYS.INTL
If you are using the NETWORKDAYS.INTL function, an incorrect weekend parameter might cause Sunday to be treated as a standard working day.
Convert Text Dates Using Text to Columns
Data imported from external systems often format dates as text, causing date-based formulas to return inaccurate results.
Calculate Working Days Easily in WPS Spreadsheet
WPS Spreadsheet offers full support for advanced date functions like NETWORKDAYS and NETWORKDAYS.INTL, allowing you to seamlessly calculate project timelines and working days with perfect Microsoft Excel compatibility.
- 1. Open your file: Launch WPS Spreadsheet and open the workbook containing your project dates.
- 2. Start the formula: Select the target cell and type =NETWORKDAYS( to initiate the formula.
- 3. Select date parameters: Click your start date cell, type a comma, click your end date cell, and type a closing parenthesis.
- 4. Calculate: Press Enter to instantly calculate the accurate number of working days.

Frequently Asked Questions
Does the NETWORKDAYS function include both the start and end date?
Yes, the NETWORKDAYS function counts working days inclusively. If both the start and end date fall on the same working day, the function will return 1.
How can I exclude holidays from my NETWORKDAYS calculation?
You can exclude holidays by adding a third optional argument to the formula that references a range of cells containing your holiday dates. For example: =NETWORKDAYS(A2, B2, C2:C10).
What is the difference between NETWORKDAYS and NETWORKDAYS.INTL?
NETWORKDAYS assumes a standard weekend of Saturday and Sunday. NETWORKDAYS.INTL allows you to customize which days of the week are considered weekends by adding a specialized weekend parameter to the formula.