Fix Microsoft Project Subtask Duration Not Matching Task Dates
Question details
User needs to fix an issue where the displayed task and summary task durations do not align with the actual start and finish dates.

- Product
- Microsoft Project
- Device & OS
- not provided
- Scenario
- Calculating task durations and scheduling project timelines.
- Observed behavior
- Subtask durations and summary task dates are mismatched, often caused by manual date entries, calendar constraints, or custom rounding formulas.
Verify whether you are using Project Desktop, Project Online, or Project for the web, as the interface for checking task calendars and constraints may vary slightly across versions.
Use Auto Schedule and Remove Manual Date Constraints
Entering dates manually forces constraints that prevent dynamic scheduling. Relying on durations and task dependencies resolves most mismatch issues.
In Microsoft Project, manually typing a start or finish date creates a constraint (like 'Start No Earlier Than'). This breaks the dynamic calculation of your project schedule.
Select the subtasks in your project schedule that are displaying incorrect durations.
Navigate to the Task tab on the ribbon and click 'Auto Schedule' in the Tasks group to enable dynamic calculation.
Double-click a task to open the Task Information dialog. Go to the Advanced tab and change the Constraint Type to 'As Soon As Possible'.
Instead of typing dates, enter the required working time in the Duration column (e.g., '3 days') and define task relationships using the Predecessors column.

Check Project and Task Calendars
Conflicting working times between the base project calendar and individual task calendars can cause the duration calculation to misalign with the calendar dates.
Verify Summary Task Calculations and Custom Fields
Summary tasks are automatically calculated based on subtasks. Additionally, custom duration fields might be using rounding formulas that alter the displayed numbers.
Manage Your Projects Efficiently with WPS Office
While Microsoft Project is built for highly complex scheduling, it can often overcomplicate basic task management. WPS Office provides a free, lightweight, and highly compatible alternative. You can easily manage project timelines, track task durations, and collaborate with your team using the built-in Gantt chart templates in WPS Spreadsheet.
- 1. Download and Install: Get WPS Office for free from the official website and install it on your device.
- 2. Access Project Templates: Open WPS Spreadsheet, go to the Homepage, and click on 'Templates'.
- 3. Start Tracking: Search for 'Gantt Chart' or 'Project Tracker' to easily map out your task durations and dependencies.

Frequently Asked Questions
Why does my summary task duration show more days than the sum of its subtasks?
Summary task duration represents the total working time from the earliest start date of the first subtask to the latest finish date of the last subtask. It includes gaps between tasks and accounts for working days, which is why it often differs from the simple mathematical sum of the subtasks.
How do I stop Microsoft Project from changing my dates?
Microsoft Project is designed to schedule dynamically. When you manually enter dates, it creates restrictive constraints. To allow proper dynamic scheduling, change your tasks to 'Auto Schedule' and use task dependencies (the Predecessors column) to drive the schedule instead of typing fixed dates.
Can I use a rounding formula for the duration field?
There is no standard rounding formula available for the default Duration field. If you require rounded durations, you must create a custom duration field (such as Duration1) and apply your custom mathematical formula to that specific field.