Create a recurring 12-month schedule in which the month rolls from 12 back to 1, the year increases automatically, and the third Tuesday of each month is calculated.

- Product
- Microsoft Excel
- Device & OS
- not provided
- Scenario
- The user needs a schedule that can be filled down for consecutive months without manually changing the year after December.
- Observed behavior
- The desired result is a continuous monthly schedule with correct month, year, and third-Tuesday dates.
Enter the starting month as a number from 1 to 12 in cell A2 and the starting year in cell B2. Format the date column as a date so the calculated third Tuesday is easy to read.
Use formulas to roll the month and year forward automatically
Use this method when your schedule stores the month and year in separate columns and needs to continue correctly after December.
The month formula resets 12 to 1, while the year formula checks whether the previous row was December and adds one year when needed.
In Excel, type the starting month number in A2, such as 11, and type the starting year in B2, such as 2026.
Select cell A3 and enter =IF(A2=12,1,A2+1). This changes December (12) to January (1) and otherwise adds one month.
Select cell B3 and enter =IF(A2=12,B2+1,B2). This increases the year only when the prior month in column A is 12.
Select cell C3 and enter =DATE(B3,A3,1)+MOD(2-WEEKDAY(DATE(B3,A3,1),2),7)+14. The formula finds the first Tuesday of the selected month and adds 14 days to return the third Tuesday.
Select A3:C3 and drag the fill handle down for as many months as needed. Excel will continue the month, year, and third-Tuesday calculations.

Use a single date column for a simpler rolling monthly schedule
Use this option when you do not need separate month and year columns and prefer to generate each monthly date from one starting date.
Build a Rolling Monthly Schedule in WPS Spreadsheets
WPS Spreadsheets can create the same rolling 12-month schedule with formulas that advance months, update years after December, and calculate recurring weekday dates such as the third Tuesday.
- 1. Set up month and year columns: Open WPS Spreadsheets and enter the starting month in A2 and starting year in B2.
- 2. Add the rolling month formula: In A3, enter =IF(A2=12,1,A2+1), then use the fill handle to copy it downward.
- 3. Add the automatic year formula: In B3, enter =IF(A2=12,B2+1,B2), then fill the formula down beside the month column.
- 4. Calculate each third Tuesday: In C3, enter =DATE(B3,A3,1)+MOD(2-WEEKDAY(DATE(B3,A3,1),2),7)+14 and fill down for all schedule rows.

Frequently Asked Questions
What formula changes December to January in a rolling schedule?
Use =IF(A2=12,1,A2+1) in the next month cell. It returns 1 when the prior month is 12; otherwise, it adds 1.
How can the year increase only after December?
Use =IF(A2=12,B2+1,B2) in the next year cell. The formula checks the previous month value in A2 and adds one to the year only after December.
How do I find the third Tuesday of a specified month in Excel?
Use =DATE(B3,A3,1)+MOD(2-WEEKDAY(DATE(B3,A3,1),2),7)+14, where B3 contains the year and A3 contains the month number.
Can I use a real date instead of separate month and year cells?
Yes. Enter the first day of a month, use =EDATE(A2,1) to move to the next month, and use YEAR and MONTH in the third-Tuesday formula to calculate the recurring date.