Question details
The user needs Excel formulas that return 1 when one date is at least six months before or after another date and 0 otherwise.

- Product
- WPS Office Spreadsheets
- Device & OS
- not provided
- Scenario
- Comparing two date values in a worksheet to determine whether the gap between them is at least six months.
- Observed behavior
- The desired result is a formula that returns 1 when the dates are at least six months apart and 0 when they are less than six months apart.
Confirm that the cells containing the dates are actual date values, not text, and identify which date is earlier so the DATEDIF start_date and end_date arguments are in chronological order.
Use DATEDIF to Check Six Complete Months Between Dates
Best when you need to count complete calendar months and return 1 when the first date is at least six months before or after the second date.
DATEDIF counts complete calendar months between two dates. If the start_date is after the end_date, the function returns a #NUM! error, so keep the arguments chronological. The formulas below use IF to output 1 when six or more complete months are detected, otherwise 0.
Select the blank cell where you want the 1 or 0 result to appear in WPS Spreadsheets.
Type =IF(DATEDIF(A2,B2,"m")>=6,1,0) to return 1 when the date in A2 is at least six months before the date in B2.
Type =IF(DATEDIF(B2,A2,"m")>=6,1,0) to return 1 when the date in A2 is at least six months after the date in B2.
Press Enter and change the sample dates to confirm the formula returns 1 for gaps of six complete months or more and 0 otherwise.

Use EDATE to Test Six Months by Shifting the Comparison Date
Alternative when you prefer to compare a date directly against another date shifted exactly six months forward or backward.
Use WPS Spreadsheets to Check Six-Month Date Gaps
Apply the same DATEDIF and EDATE formulas in WPS Office Spreadsheets to return 1 or 0 when two dates are at least six months apart, with Excel formula compatibility and a familiar interface.
- 1. Open WPS Office Spreadsheets: Launch WPS Office and open or create a spreadsheet containing the two date cells you want to compare.
- 2. Apply the DATEDIF formula: Select a blank result cell and enter =IF(DATEDIF(A2,B2,"m")>=6,1,0) after replacing A2 and B2 with your date cell references.
- 3. Save in Excel-compatible format: Press Ctrl+S and save the workbook as .xlsx to keep it compatible with Microsoft Excel.

Frequently Asked Questions
Why does DATEDIF return #NUM! when I compare my dates?
DATEDIF requires the start_date argument to be earlier than the end_date. Use =IF(DATEDIF(A2,B2,"m")>=6,1,0) only when A2 is before B2, or wrap the dates with MIN and MAX to avoid the error.
Does the formula count six 30-day months or six calendar months?
DATEDIF counts complete calendar months, so June 1 to December 1 is six months, while June 1 to November 30 is five complete months.
How can I check six months apart in either direction with one formula?
Use =IF(OR(DATEDIF(A2,B2,"m")>=6,DATEDIF(B2,A2,"m")>=6),1,0), or use MIN and MAX inside DATEDIF to handle the date order automatically.
Can I use these date comparison formulas in WPS Spreadsheets?
Yes. WPS Spreadsheets supports DATEDIF, EDATE, IF, OR, MIN, and MAX, and it opens and saves .xlsx workbooks with the same formula behavior.