Question details

The user wants to generate a calendar or sequence of workdays automatically using Excel dynamic array functions.

How to Create a Workday Calendar Using Excel Dynamic Array Formulas
Product
Excel
Device & OS
not provided
Scenario
Building an automated workday schedule or calendar that skips weekends and calculates specific working periods.
Observed behavior
Needs efficient formula combinations utilizing SEQUENCE, WORKDAY, WORKDAY.INTL, and LET functions to dynamically populate continuous dates.
Before you start

Ensure you are using a modern spreadsheet version (like Microsoft 365, Excel 2021, or the latest WPS Spreadsheet) that supports Dynamic Array formulas such as SEQUENCE and LET.

Solution 1Recommended

Use LET and FILTER to Return All Weekdays in the Current Year

This formula dynamically calculates the number of days in the current year and filters out the weekends automatically.

By combining the LET function to establish variables and the FILTER function to evaluate weekdays, this method creates a robust, auto-spilling array of all Monday to Friday dates for the current year.

1
Select Output Cell

Click on the specific cell where you want the workday calendar to begin.

2
Input the Formula

Type or paste the following formula: =LET(days,DATE(YEAR(TODAY()),12,31)-DATE(YEAR(TODAY()),1,1)+1,dates,DATE(YEAR(TODAY()),1,1)+SEQUENCE(days,,0),FILTER(dates,WEEKDAY(dates,2)<=5))

3
Execute the Formula

Press Enter. The formula will immediately spill down to list all weekdays in the current year.

Format Output as Dates: If the results appear as numbers (e.g., 45000), select the spilled array, right-click, choose 'Format Cells', and apply a standard Date format.
Advanced Spreadsheet Tool

Effortlessly Manage Dynamic Array Formulas in WPS Spreadsheet

WPS Spreadsheet fully supports advanced array functions like SEQUENCE, LET, and WORKDAY.INTL. You can seamlessly calculate and manage your dynamic workday calendars using the exact same formulas.

  1. 1. Download and Install: Get the latest version of WPS Office from the official website and open WPS Spreadsheet.
  2. 2. Open Your Workbook: Create a new blank spreadsheet or open an existing Excel (.xlsx) file containing your schedules.
  3. 3. Apply the Array Formula: Type your SEQUENCE or WORKDAY array formula into the desired starting cell and press Enter.
  4. 4. Format Cells as Dates: Select the newly spilled array range, go to the Home tab, and choose 'Short Date' from the number formatting dropdown.
Fully compatible with Microsoft Excel .xlsx formats and dynamic array functions.Easily process SEQUENCE and WORKDAY functions to generate workday calendars.Lightweight, fast, and completely free alternative for complex data management.
microsoft office alternative - wps office

Frequently Asked Questions

Why is my dynamic array formula returning a #SPILL! error?

A #SPILL! error occurs when there is existing text, data, or merged cells in the range where the formula needs to output its results. Clear the cells directly below your formula so it has enough empty space to spill the entire workday calendar.

How can I format the resulting numbers as actual dates?

Date formulas calculate values using serial numbers (like 44927). To display them properly, highlight the entire spilled array, navigate to the Home tab, click the Number Format dropdown menu, and select either Short Date or Long Date.

Can I exclude public holidays using these dynamic array formulas?

Yes. Both the WORKDAY and WORKDAY.INTL functions have an optional [holidays] argument. You can create a list of your specific holiday dates in a separate range, and reference that range at the end of your WORKDAY formula (e.g., =WORKDAY(TODAY(),SEQUENCE(252),1, A1:A10)).