Function Problems

How to Repeat Assessment Dates for Every 210 Employees in WPS Office Excel

John WilsonJohn Wilson Nov 13, 2026 869 views

Question details

The user needs to assign the same assessment date to each group of 210 employees in Excel and advance to the next Egyptian business day for each new group, skipping Fridays, Saturdays, and public holidays.

How to Repeat Assessment Dates for Every 210 Employees in WPS Office Excel
Product
WPS Office Excel
Device & OS
not provided
Scenario
The user manages a large employee list and must schedule assessment dates in groups or batches, with dates that skip weekends and holidays according to the Egyptian workweek.
Observed behavior
A formula-driven method is needed to fill assessment dates down a column so that each new 210-row batch moves to the next valid business day.
Before you start

Prepare a holiday range before applying the formula, and confirm the first assessment date is entered in K2. If different departments use different batch sizes, prepare a helper column with those batch-size values.

Solution 1Recommended

Use WORKDAY.INTL to Repeat Assessment Dates for Each 210-Employee Batch

Best for a single batch size of 210. This formula fills the assessment date down the list and advances only after every 210 rows.

The formula uses WORKDAY.INTL with weekend code 7 to treat Friday and Saturday as the weekend. It also accepts a holiday range so public holidays are skipped when the next date is calculated.

1
Enter the first assessment date in K2

Select cell K2 in your Excel worksheet and type the starting assessment date, for example 1/1/2026.

2
Enter the batch date formula in K3

Select K3 and enter: =WORKDAY.INTL(K2,IF(MOD(ROWS($K$2:K3)-1,210)=0,1,0),7,HolidayRange)

3
Define HolidayRange for public holidays

Replace HolidayRange with your actual holiday range, such as $H$2:$H$20, or create a named range containing Egyptian public holidays.

4
Fill the formula down the employee list

Drag the fill handle from K3 down to the last employee row. Each group of 210 rows keeps the current date, and the next group advances to the next Egyptian business day.

Use WORKDAY.INTL to Repeat Assessment Dates for Each 210-Employee Batch
Formula result: The formula treats Friday and Saturday as weekend days because weekend code 7 is used, and it increments the date only when the row counter reaches a multiple of 210.
WPS Office Excel

Complete the Batch Assessment Date Task in WPS Office Excel

Use the WORKDAY.INTL formula in WPS Office Excel to repeat assessment dates for every 210 employees, skip Egyptian weekends and public holidays, and fill the schedule down the entire list.

  1. 1. Open your employee workbook in WPS Office: Launch WPS Office, open the Excel file that contains the employee list, and go to the worksheet where assessment dates should be added.
  2. 2. Enter the first date and formula: Type the first assessment date in K2, then in K3 enter: =WORKDAY.INTL(K2,IF(MOD(ROWS($K$2:K3)-1,210)=0,1,0),7,HolidayRange).
  3. 3. Fill the formula to all employees: Drag the fill handle down from K3 to the last row to generate the repeated batch dates.
  4. 4. Review the schedule: Check that each 210-row group shows the intended date and that Egyptian weekends and holidays are skipped.
Assigns the same assessment date to each 210-employee batch automaticallySkips Fridays, Saturdays, and listed public holidays with WORKDAY.INTLCompatible with Microsoft Excel .xlsx workbooks and formulasFree and familiar spreadsheet interface with no new learning curveEasy to adapt to department-specific batch sizes
QA img-9

Frequently Asked Questions

How do I make every group of 210 employees share the same assessment date in Excel?

Enter the first assessment date in K2, then use =WORKDAY.INTL(K2,IF(MOD(ROWS($K$2:K3)-1,210)=0,1,0),7,HolidayRange) in K3 and fill the formula down.

What does weekend code 7 mean in WORKDAY.INTL?

Weekend code 7 means only Friday and Saturday are treated as weekends, matching the Egyptian business week. Monday through Thursday and Sunday are treated as workdays.

How do I include Egyptian public holidays in the assessment date calculation?

Replace HolidayRange in the formula with the range containing holiday dates, for example =WORKDAY.INTL(K2,IF(MOD(ROWS($K$2:K3)-1,210)=0,1,0),7,$H$2:$H$20).

Can I use different batch sizes for different departments?

Yes. Replace 210 with a cell reference containing the department batch size, such as =WORKDAY.INTL(K2,IF(MOD(ROWS($K$2:K3)-1,L2)=0,1,0),7,HolidayRange), where L2 holds the batch size.

Why does the formula sometimes not move to the next date after exactly 210 rows?

Make sure the formula starts in K3 and uses ROWS($K$2:K3)-1, not ROW(K3). The ROWS method keeps the counter correct even if rows are inserted or removed above the data.