A starting date is stored in D2 and the number of calendar days to add is stored in C2.
Observed behavior
The calculated date may fall on Saturday or Sunday and needs to be adjusted to the next weekday.
Before you start

Confirm that D2 contains a valid date and C2 contains a numeric number of calendar days. Format the formula cell as a date so the result displays correctly.

Solution 1Recommended

Use WEEKDAY to move weekend results to the following Monday

Use this formula when the calculation must add calendar days first and then adjust Saturday or Sunday to a weekday.

Use WEEKDAY with return type 2 so Monday is 1, Saturday is 6, and Sunday is 7. This makes the weekend test and adjustment unambiguous.

1
Select the result cell

In WPS Spreadsheet, click the cell where you want the adjusted date to appear.

2
Enter the formula

Enter =IF(WEEKDAY(D2+C2,2)>5,D2+C2+CHOOSE(WEEKDAY(D2+C2,2)-5,2,1),D2+C2) and press Enter.

3
Check the result

The formula adds C2 calendar days to D2. If the result is Saturday, it adds two days; if it is Sunday, it adds one day to reach Monday.

4
Format the date

If the result appears as a number, select the cell, open the Home tab, choose the Number Format menu, and select Date.

Weekend adjustment completed: The formula preserves weekday results and moves Saturday or Sunday results to the next Monday.

Calculate Adjusted Weekday Dates in WPS Spreadsheet

WPS Spreadsheet lets you combine date arithmetic with WEEKDAY, CHOOSE, or WORKDAY functions to add calendar days and shift weekend results to Monday. Its familiar formula interface makes it easy to review and reuse the calculation.

  1. 1. Open WPS Spreadsheet: Launch WPS Office and open an existing workbook or create a new spreadsheet.
  2. 2. Enter the source values: Place the starting date in D2 and the number of calendar days in C2.
  3. 3. Add the formula: Select the result cell and enter =IF(WEEKDAY(D2+C2,2)>5,D2+C2+CHOOSE(WEEKDAY(D2+C2,2)-5,2,1),D2+C2).
  4. 4. Format and verify: Apply a Date format from the Home tab and verify that weekend results are moved to Monday.
Automatically moves Saturday and Sunday results to the following MondaySupports WEEKDAY, CHOOSE, and WORKDAY formulas for flexible date calculationsWorks with Microsoft Excel .xlsx and .xls filesProvides a familiar spreadsheet interface for easy formula migration
microsoft office alternative - wps office

Frequently Asked Questions

Why should the formula use WEEKDAY with a return type of 2?

WEEKDAY(date,2) numbers Monday as 1 through Sunday as 7. That means values greater than 5 identify Saturday and Sunday consistently, allowing the formula to add two days to Saturday and one day to Sunday.

What formula moves a Saturday result to Monday and a Sunday result to Monday?

Use =IF(WEEKDAY(D2+C2,2)>5,D2+C2+CHOOSE(WEEKDAY(D2+C2,2)-5,2,1),D2+C2). The CHOOSE function returns 2 for Saturday and 1 for Sunday.

Can I use WORKDAY instead of IF and WEEKDAY?

Yes. Use =WORKDAY(D2+C2-1,1) when you only need to shift a calculated weekend date to the next weekday. Add a holiday range as the third argument if holidays should also be excluded.

Why does my original WEEKDAY formula adjust the wrong day?

If WEEKDAY is used without a return type, WPS Spreadsheet normally numbers Sunday as 1 and Saturday as 7. A condition such as WEEKDAY(date)>5 then does not match the intended Monday-through-Sunday numbering. Add ,2 to WEEKDAY or use the WORKDAY alternative.