Fix Missing Project Baseline in Project Online
Question details
A Project Online baseline is missing from the Set Baseline dialog box, even though baseline dates are still visible in the Gantt Chart and baseline columns.

- Product
- Project Online
- Device & OS
- not provided
- Scenario
- Viewing and managing project baselines and tracking task progress.
- Observed behavior
- The baseline data fails to appear in the Set Baseline dialog. Additionally, users may see incorrect baseline dates (such as 1984) and receive incorrect approval notifications due to assignment owner settings.
Ensure you have the appropriate permissions to view, edit, and manage baselines in your specific Project Online environment before troubleshooting.
Verify Baseline Data in the Gantt Chart View
Confirm that your baseline data is still saved in the system by manually checking the Gantt Chart and baseline columns, which often bypasses dialog box display glitches.
Sometimes the Set Baseline dialog fails to load saved baselines due to temporary display issues, but the data itself remains intact within the project columns.
Navigate to your project in Project Online and switch your current view to the standard Gantt Chart.
Right-click on the existing column headers, select 'Insert Column', and add the 'Baseline Start' and 'Baseline Finish' columns.
Verify if the baseline dates are populated in these columns. Ask other team members to open the same project view to determine if the baseline is missing only on your specific account.

Correct System Date, Time, and Regional Settings
Fix unusual baseline date displays (such as defaulting to 1984) by aligning your computer's system time with your Project Online account settings.
Update Assignment Owner Settings for Notifications
Resolve the issue of receiving approval notifications for projects you no longer manage by correcting the assignment owner field.
Manage Project Timelines Easily with WPS Office
While Microsoft Project Online handles complex enterprise portfolios, WPS Office offers a free, lightweight, and highly compatible alternative for everyday project tracking. Use WPS Spreadsheet to quickly build Gantt charts, manage task lists, and share schedules without complex setups or expensive subscriptions.
- 1. Download and Install: Download WPS Office for free from the official website and install it on your computer.
- 2. Open WPS Spreadsheet: Launch WPS Spreadsheet and search the built-in template library for 'Gantt Chart' or 'Project Schedule'.
- 3. Track Your Project: Input your tasks, start dates, and durations to automatically generate and track a visual timeline.

Frequently Asked Questions
Why does my baseline show the year 1984 in Project Online?
This date anomaly is typically caused by a mismatch between your computer's system time configurations and the Regional and Language settings in your Microsoft account. Updating both settings to reflect your correct local time zone will usually resolve the display error.
Can a baseline still be active if the Set Baseline dialog is completely empty?
Yes. Occasionally, a browser or software glitch prevents the Set Baseline dialog from loading saved baselines. Even if the dialog is empty, the baseline data may still be securely saved and visible by inserting the Baseline Start and Baseline Finish columns in the Gantt Chart view.
How do I stop receiving approval notifications for a project after assigning a new project manager?
Approval notifications are routed based on the 'Assignment Owner' field, not just the project manager role. To stop receiving notifications, you must change the Assignment Owner field for the specific tasks to the new project manager, then save and publish the project.