How to Add More Than 20 Checklist Items in Microsoft Planner
Question details
The user needs to track more than 20 checklist items for a Microsoft Planner task.

- Product
- Microsoft Planner
- Device & OS
- not provided
- Scenario
- A task requires a checklist with more than 20 items.
- Observed behavior
- Planner prevents the user from adding more than 20 checklist items to a single task.
Open the plan and identify which checklist items can be grouped into separate tasks. If you prefer a separate list, check that Microsoft Lists is available in your Microsoft 365 account.
Split the Checklist Across Multiple Planner Tasks
Keep the work in Planner by dividing a long checklist into related tasks.
The standard checklist limit cannot normally be increased in task settings. Each new task has its own checklist and progress.
Open your plan in Microsoft Planner and select Add task in the appropriate bucket. Create additional tasks for the groups of checklist items.
Open each task, find Checklist, and select Add an item to enter the items for that group. Keep each task's checklist within the 20-item limit.
Use descriptive task names, such as Part 1 and Part 2, and add details in each task's Notes or description so team members can identify the related tasks.

Track the Longer Checklist in Microsoft Lists
Use a separate list when the checklist needs more rows than a Planner task allows.
Track a Longer Checklist in WPS Spreadsheet
WPS Office is a free, lightweight Office alternative with a familiar interface. Use WPS Spreadsheet to maintain a longer checklist in rows and move existing spreadsheet files into your workflow. It does not change Microsoft Planner's checklist limit.

Frequently Asked Questions
Can I increase the 20-item limit in Planner task settings?
The standard limit cannot normally be increased through task settings. Split the items across tasks or track them in a separate tool such as Microsoft Lists.
Can I request a higher checklist limit from Microsoft?
Yes. Submit a feature request through the Microsoft Planner feedback forum. Feedback does not immediately change the current limit.
Does a linked Microsoft List update the Planner checklist automatically?
No. A link in the Planner task gives collaborators access to the list, but list entries and Planner checklist progress remain separate.
Will using Planner in Microsoft Teams remove the checklist limit?
Using Planner in Teams does not normally remove the per-task checklist limit. Use multiple tasks or a separate list for a longer checklist.