How to Fix Blank or Duplicate Resource Lines in Microsoft Project
Question details
The user is seeking a way to resolve an issue in Microsoft Project where duplicate or blank resource assignment lines appear unexpectedly.

- Product
- Microsoft Project
- Device & OS
- not provided
- Scenario
- Assigning and managing resources across a single project file, linked subprojects, or a shared resource pool.
- Observed behavior
- Duplicate or blank resource lines appear in the view. In some instances, the blank rows temporarily disappear after the project file is saved and reopened.
Before altering project links or resource pools, save a backup copy of your Microsoft Project file to prevent accidental data loss during troubleshooting.
Verify Linked Projects and Shared Resource Pools
Check your project's structure to ensure resources aren't being duplicated via linked subprojects or improper resource pool connections.
Blank or duplicate resource lines often occur when multiple project files share the same resource pool, or when resources are improperly assigned across master and subprojects.
Navigate to the Resource tab, click on 'Resource Pool', and select 'Share Resources' to verify if your file is pulling from an external resource pool.
If you are working in a master project file, expand all linked subprojects to check if the same resource was created locally in multiple files instead of being pulled from a central pool.
Unlink unnecessary shared files or consolidate local resources into a single enterprise or shared pool to eliminate duplicates.

Manually Delete Blank Assignments and Refresh Data
Remove any accidentally created blank resource assignments and force the application to refresh the view.
Track Projects Efficiently with WPS Office
While Microsoft Project is used for complex resource pooling, you can easily track project timelines, resources, and tasks for free using WPS Spreadsheet. WPS Office provides a lightweight, highly compatible alternative for everyday project management needs.
- 1. Open WPS Spreadsheet: Launch WPS Office and open a new Spreadsheet document.
- 2. Access Project Templates: Click on 'New' and search for 'Project Tracker' or 'Gantt Chart' in the template library.
- 3. Customize Your Resources: Download a free template and start assigning tasks and resources to your team immediately without complex linking.

Frequently Asked Questions
Why do blank rows disappear after saving and reopening Microsoft Project?
Microsoft Project often cleans up uncommitted or temporary blank assignment rows during the file saving process. Closing and reopening the file forces a data refresh, which removes these visual anomalies from the view.
How do shared resource pools cause duplicate resources?
If a local resource is created in a project file with the exact same name as an existing resource in a connected shared pool, Project may display both entries, resulting in duplicates. You should always link to the central pool before adding resource names manually.
Can I prevent duplicate resources when using linked subprojects?
Yes. To prevent duplicates, use a centralized shared resource pool file for all your linked subprojects. Avoid creating local resources directly within each individual subproject, as consolidating them into a master project will cause duplicates to appear.




