Troubleshoot Microsoft Project 2013 Subprojects That Do Not Update
Question details
Find out why a linked subproject in a Project 2013 master schedule does not update when expanded.

- Product
- Microsoft Project 2013
- Device & OS
- not provided
- Scenario
- A user expands a subproject in a master schedule and expects its latest information to appear.
- Observed behavior
- The subproject stops updating when expanded. The behavior affects multiple files and computers, although it works in Project 2010.
In Project, open File > Account > About Project to confirm the version and build. Identify the master file and the locations of its linked subprojects so you can check access to each one.
Install the Latest Available Project 2013 Updates
Use this first to rule out an outdated Project installation before testing the files.
Open Project and select File > Account > About Project. Record the version, build number, and whether the installation is 32-bit or 64-bit.
If File > Account shows Update Options, select Update Options > Update Now. Otherwise, use Windows Update to check for available Microsoft product updates.
Restart Project, open the master schedule, and expand the linked subproject to see whether its information updates.
Test a New Master and Subproject
Create both files from scratch to determine whether the behavior is specific to the original files.
Check Linked Subproject Access and File Formats
Use this check when the master may not be able to reach or open its linked files.
Review Exported Project Data in WPS Spreadsheets
WPS Office is a free, lightweight alternative for working with Office documents through a familiar interface. Export Project data to Excel and open it in WPS Spreadsheets for an easy transition to spreadsheet-based review. WPS does not repair Project subproject links or replace the master schedule.
- 1. Export the data: In Microsoft Project, select File > Save As, choose the Excel workbook format, and follow the export prompts.
- 2. Open the workbook: In WPS Office, select Open and choose the exported XLSX file.
- 3. Review the tasks: Use WPS Spreadsheets to review or organize the exported task data. Continue to use Project for linked schedules and scheduling features.

Frequently Asked Questions
How do I find my Project 2013 build number?
Select File > Account > About Project. The dialog shows the version and build information, including whether Project is 32-bit or 64-bit.
Why should I create a new subproject as well as a new master?
Reusing an old subproject can carry the same file-specific issue into the test. Create both files from blank projects, then link them through Project > Subproject.
What should I check if a linked subproject was moved?
Open the master and inspect the subproject's information to check its linked file and path. Also use File > Open to verify that the subproject is accessible at its current location.
Can WPS Office fix a Project 2013 subproject link?
No. Troubleshoot the link in Microsoft Project. You can export task data through File > Save As and open the resulting Excel workbook in WPS Spreadsheets for review.