Workarounds for Missing Autocomplete in Microsoft Project 2016
Question details
The user is trying to restore the autocomplete feature for existing field values in Microsoft Project 2016, which was previously available in Project 2013.

- Product
- Microsoft Project 2016
- Device & OS
- not provided
- Scenario
- Typing repetitive data into project fields where autocomplete is expected to speed up data entry.
- Observed behavior
- Project 2016 requires the user to type out the full name manually, instead of automatically completing existing field values while typing.
Be aware that Microsoft intentionally removed the native autocomplete feature for text fields in Project 2016, meaning there is no setting or registry tweak to turn it back on. You will need to set up a Custom Lookup Table to replicate this functionality.
Use a Custom Lookup Table to Emulate Autocomplete
Since native autocomplete was removed, configuring a custom text field with a lookup table provides a drop-down list of your predefined values, preventing repetitive typing.
By utilizing lookup tables, you can enforce consistency in your data entry and avoid typing out long names or values repeatedly. This is the official workaround recommended for replacing the legacy autocomplete feature.
Navigate to the 'Project' tab on the ribbon and click on 'Custom Fields' in the Properties group.
In the Custom Fields dialog box, ensure the 'Task' or 'Resource' radio button is selected depending on your needs. Choose 'Text' from the Type drop-down list, and select an available field (e.g., Text1).
Click the 'Rename' button to give your custom field a descriptive name that reflects the data you will be entering.
Under the 'Custom attributes' section, select the 'Lookup...' button. In the Lookup Table dialog, type the values you frequently use into the 'Value' column.
Click 'Close' and then 'OK' to save the custom field. Insert this new column into your project view. You can now select values from a drop-down menu instead of typing them out completely.
Submit Feature Request Feedback to Microsoft
Since the feature was removed at the software level, the only way to influence its return in future updates is by submitting direct feedback to the development team.
Manage Your Project Data Efficiently with WPS Office
If the limitations of Microsoft Project are slowing down your workflow, consider managing your project tasks, timelines, and resource assignments using WPS Spreadsheet. It features robust native autocomplete capabilities, flexible drop-down data validation, and is highly compatible with Microsoft Excel, making project tracking seamless and free.
- 1. Download and Install: Get WPS Office for free from the official website and install it on your device.
- 2. Open WPS Spreadsheet: Launch WPS Spreadsheet and create a new workbook or open an existing project tracking template.
- 3. Enjoy Native Autocomplete: Start typing your project data into a column; WPS Spreadsheet will automatically suggest existing entries to complete your field values.

Frequently Asked Questions
Why did Microsoft remove the autocomplete feature in Project 2016?
Microsoft occasionally deprecates or removes features during software version upgrades to streamline the application's backend or due to low usage metrics. The native text field autocomplete was intentionally removed starting in the 2016 version.
Is there any registry hack to force autocomplete in MS Project 2016?
No, the core functionality for text field autocomplete was entirely removed from the application's code in the 2016 version. Modifying the registry will not restore this specific feature.
Does Microsoft Project 2019 or Project Online have the autocomplete feature?
The standard autocomplete behavior for plain text fields remains absent in newer versions like Project 2019, Project 2021, and the Project Online Desktop Client. Users must continue using Lookup Tables or drop-down lists.
Can I import a long list of values into a Project Lookup Table?
Yes, if you have a long list of values, you can type them out in Excel, copy the entire list, and then paste them directly into the Value column of the Lookup Table dialog box in Microsoft Project.




