How to Copy Tasks and Assignees Between Projects in Microsoft Planner
Question details
The user wants to duplicate existing tasks and their corresponding team member assignments to new project plans that share similar workflows.

- Product
- Microsoft Planner
- Device & OS
- not provided
- Scenario
- Creating a new project plan by reusing the task structure, deadlines, and resources from a previous project.
- Observed behavior
- The native 'Copy a plan' feature successfully duplicates basic task details but drops plan members, assignments, and certain other elements.
Verify that you have the necessary Microsoft 365 permissions to create new groups and plans before attempting to duplicate an existing project.
Duplicate the Plan Structure and Reassign Members Manually
Use the built-in copy feature to transfer the reusable workflow and task structure, then manually add members and assignees to the new plan.
Microsoft Planner's 'Copy a plan' function is designed to recreate the framework of a project. However, because new plans are often linked to different Microsoft 365 Groups with distinct member lists, Planner drops the user assignments to prevent permission conflicts.
Open Microsoft Planner and navigate to the specific plan you want to duplicate.
Click the three horizontal dots (...) at the top of the plan board and select 'Copy plan' from the dropdown menu.
Name your new plan, choose an existing Microsoft 365 Group or create a new one, and select the specific elements (like Priority, Dates, and Checklists) you want to include, then click 'Copy'.
Open the newly copied plan, ensure all required team members are added to the group, and manually assign them to their respective tasks.

Submit Feature Feedback to Microsoft
Request comprehensive task and assignee duplication capabilities directly from Microsoft to help prioritize future updates.
Manage Complex Projects Effortlessly with WPS Office
If Microsoft Planner's limitations are slowing down your workflow, consider utilizing highly customizable project management spreadsheets. WPS Office is a free, comprehensive suite that allows you to easily duplicate entire project plans—including task assignees, statuses, and notes—without arbitrary software restrictions.
- 1. Download WPS Office: Visit the official WPS website to download and install the free office suite.
- 2. Open a Project Tracker: Launch WPS Spreadsheet and search for 'Project Management' in the built-in template library.
- 3. Duplicate Without Limits: Customize your tracker, and easily copy the entire spreadsheet file to duplicate projects with all assignees intact.

Frequently Asked Questions
What task details actually get duplicated when I copy a plan in Microsoft Planner?
When you copy a plan, Planner duplicates the task names, buckets, priority, start and due dates, descriptions, checklists, and labels. It intentionally excludes plan members, task assignments, attachments, and comments.
Can I copy an individual task to another project instead of the entire plan?
Yes. Click the three dots on a specific task card and select 'Copy task'. You can then choose a different destination plan and bucket, and select which task elements to transfer. However, assignees will still not be copied.
Why doesn't Microsoft Planner allow copying assigned members?
Microsoft Planner ties task assignees directly to the membership list of the specific Microsoft 365 Group associated with the plan. Because a copied plan may belong to a completely different group with different members, Planner prevents assignee duplication to avoid permission errors.