Make a Successor Task Start After Its Predecessor in Microsoft Project
Question details
The user wants a successor task to start after its predecessor finishes in Microsoft Project.

- Product
- Microsoft Project
- Device & OS
- not provided
- Scenario
- Two tasks are linked, but the successor's scheduled start date does not appear to follow the predecessor's finish date.
- Observed behavior
- Unexpected dates may occur because of the dependency settings, scheduling mode, constraints, calendars, actual dates, or other task settings.
Open the project in Gantt Chart view and identify the predecessor and successor tasks. Check whether either task has already started, because actual dates can affect the schedule.
Check the finish-to-start link and automatic scheduling
Use this approach when a successor appears to start before its predecessor finishes.
Double-click the successor task, open the Predecessors tab, and confirm that the correct predecessor is listed with Type set to Finish-to-Start (FS). Set Lag to 0 if no overlap or delay is intended.
Select both tasks in Gantt Chart view, then choose Task > Auto Schedule. Check the Task Mode column to confirm that neither task is manually scheduled.
Double-click each task and open the Advanced tab in Task Information. Review the constraint type and date; for a project scheduled from its start date, use As Soon As Possible if a fixed constraint is not required.
Open Task Information and review the successor's Predecessors tab for additional links. In the task table, insert the Actual Start and Actual Finish columns to check whether recorded progress is affecting the dates.
Use Project > Change Working Time to review working time, and check task or resource calendars in their respective information dialogs. Open the Resource tab's leveling options to review whether leveling has delayed the successor.

Review summary-task links and project calculation
Use these checks if the dependency is correct but the schedule still does not recalculate as expected.
Track Project Tasks in WPS Spreadsheets
WPS Office is a free, lightweight, easy-to-use alternative for maintaining task lists and sharing project data in familiar spreadsheet formats. Its familiar interface makes it easy to move spreadsheet-based workflows, though it does not fix Microsoft Project scheduling or replace its dependency engine.

Frequently Asked Questions
Why does my successor start before its predecessor finishes?
Open the successor's Task Information > Predecessors tab and check that the link is Finish-to-Start with no negative lag. Also check the Task Mode and any actual start date, since manual scheduling or recorded progress can affect the displayed schedule.
Why does the successor start later than the predecessor's finish?
Check for positive lag and additional links on Task Information > Predecessors. Nonworking time, constraints, resource leveling, or another predecessor can also delay the successor.
Can two linked tasks show the same date without overlapping?
Yes. If times are hidden, the predecessor can finish and the successor can start later on the same day. Change the date format in File > Options > General to include a time and compare the values.
Does a deadline force a task to finish on time?
No. A deadline is a target that can produce an indicator when missed; it does not directly constrain the schedule. Review it on the Advanced tab of Task Information.