Fix Baseline Cost Not Updating for a Cost Resource in Microsoft Project
Question details
The user needs a newly assigned cost resource to appear in Baseline Cost and roll up appropriately in Microsoft Project.

- Product
- Microsoft Project
- Device & OS
- not provided
- Scenario
- A cost resource was assigned after a project baseline was set, and the user wants its cost reflected in the baseline.
- Observed behavior
- The assigned cost appears elsewhere in the project but does not appear as expected in Baseline Cost.
Identify the baseline you are comparing, when it was set, and whether the cost resource is assigned to a regular task or a summary task. In Microsoft Project, add the Cost, Baseline Cost, and Resource Names columns to help compare the values.
Baseline the regular tasks with new cost assignments
Use this approach when a cost resource was added after the baseline was captured and its assigned task needs a baseline cost.
A baseline is a snapshot of the plan at the time it was set. Adding a cost resource later does not automatically update Baseline Cost.
Open View > Gantt Chart and inspect the Resource Names column. Make sure the cost resource is assigned to a regular task rather than directly to a summary task.
Open View > Task Usage, expand the task, and add the Cost column if needed. Check that the cost resource's assignment row has the intended cost.
Return to View > Gantt Chart and select the regular tasks whose new assignments need to be included in the baseline.
Go to Project > Set Baseline > Set Baseline. Choose the baseline you are reviewing, select Selected tasks, and use the available roll-up option for summary tasks before clicking OK.
Compare the Cost and Baseline Cost columns for the selected tasks and their summary tasks. Confirm that the expected baseline amounts are reflected at each level.

Test baseline behavior on an existing task
Use a temporary test to determine whether Project is capturing a changed assignment cost as expected.
Track project costs in WPS Spreadsheets
WPS Office is a free, lightweight alternative for maintaining project cost tables in a familiar spreadsheet interface. Open compatible Excel files to migrate cost data and review planned and actual amounts; it does not fix Microsoft Project baselines.

Frequently Asked Questions
Why doesn't a new cost resource appear in Baseline Cost?
A baseline captures values when it is set. If the resource was assigned afterward, select the affected task and use Project > Set Baseline > Set Baseline to update the appropriate baseline.
Can I assign a cost resource directly to a summary task?
Summary tasks should not normally have resources assigned directly. Assign the cost resource to a regular task beneath the summary, then check its Cost and baseline rollup.
How can I baseline new tasks without resetting the entire project?
Select the new tasks in Gantt Chart, open Project > Set Baseline > Set Baseline, and choose Selected tasks. Review the summary-task roll-up options before clicking OK.
Where can I check the cost entered for a resource assignment?
Open View > Task Usage, expand the task, and inspect the resource assignment row. Add the Cost column if it is not visible.
Does WPS Office update Microsoft Project baselines?
No. Update the baseline in Microsoft Project. WPS Spreadsheets can help you maintain separate cost tables in Excel-compatible files.