Others

How to Bypass Project for the Web 20-Dependency Limits

Tauseeq MagsiTauseeq Magsi Oct 13, 2026 870 views

Question details

The user needs an alternative method to add more than 20 dependencies per task in Microsoft Project for the Web.

Overcoming the 20-Dependency Limit in Project for the Web
Product
Microsoft Project for the Web
Device & OS
not provided
Scenario
Creating detailed project schedules that require linking a high volume of dependent tasks.
Observed behavior
Project for the Web imposes a strict limit of 20 dependencies per task across Plans 1, 3, and 5, restricting the creation of complex project timelines.
Before you start

Verify your current Microsoft Project subscription plan to confirm whether you have access to the desktop version of Microsoft Project, as web-only plans have stricter limitations.

Solution 1Recommended

Use the Desktop Project Application

Switching to the desktop version of Microsoft Project removes the web-based 20-dependency limit and provides access to advanced scheduling capabilities.

While Project for the Web enforces a maximum of 20 dependencies per task, the desktop version included with Project Plan 3 and Project Plan 5 does not share this restriction.

Using the desktop application is the official alternative for managing large-scale projects, as it also fully supports lead and lag times.

1
Check your subscription

Log in to your Microsoft 365 account and ensure you are licensed for Project Plan 3 or Project Plan 5.

2
Install the desktop client

Download and install the Microsoft Project desktop application from your Microsoft 365 portal.

3
Manage dependencies without limits

Open your project file in the desktop application to freely add more than 20 dependencies per task and utilize advanced dependency types.

Use the Desktop Project Application
Advanced Dependency Availability: Plans 3 and 5 allow the creation of advanced dependencies like Start-to-Start (SS), Finish-to-Finish (FF), and Start-to-Finish (SF). Plan 1 users may only be able to view these advanced dependencies.
Free Microsoft Office alternative

Manage Project Timelines Flexibly with WPS Office

If you are tired of arbitrary platform limitations and expensive subscriptions, try WPS Office. It provides a lightweight, highly compatible alternative to Microsoft Office, featuring robust spreadsheet tools to build custom project trackers and Gantt charts with absolutely no dependency limits.

  1. 1. Download and Install WPS Office: Get the free WPS Office suite from the official website and install it on your device.
  2. 2. Open WPS Spreadsheet: Launch WPS Spreadsheet to create a flexible, grid-based project tracker compatible with Excel.
  3. 3. Use Project Templates: Browse the built-in template library for 'Gantt Chart' or 'Project Plan' to instantly set up your timeline without restrictive web limits.
Free, lightweight, and fast installationFully compatible with Microsoft Excel (.xlsx) formats for seamless project trackingHundreds of free, built-in project management templatesFamiliar user interface for a smooth migration
microsoft office alternative - wps office

Frequently Asked Questions

Does the Microsoft Project desktop app have the 20-dependency limit?

No, the desktop Project application, which is available with Project Plan 3 and Plan 5, avoids the web limitation entirely. It allows for an extensive number of dependencies and supports lead and lag times.

Can Project Plan 1 users create advanced dependencies?

Generally, no. Users with Project Plan 1 are restricted in their permissions and may only be able to view advanced dependencies (like SS, FF, and SF) created by others, whereas Plan 3 and 5 users can actively create them.

What are the advanced dependency types in Microsoft Project?

The advanced dependency types include Start-to-Start (SS), Finish-to-Finish (FF), and Start-to-Finish (SF). These provide more granular control over task scheduling compared to the standard Finish-to-Start (FS) dependency.