Split a Microsoft Project Master File into Linked Projects
Question details
Separate summary tasks and their child tasks from a Microsoft Project master file while managing links and updates.

- Product
- Microsoft Project
- Device & OS
- not provided
- Scenario
- A project manager wants to create separate subprojects or a static master from an existing master project.
- Observed behavior
- The desired result is a set of separate project files with understood update behavior and reduced risk from broken links.
Identify which summary tasks and child tasks belong in each subproject, and check whether the master already contains linked subprojects. Note the locations of linked files and avoid moving, renaming, or overwriting them while the master uses those links.
Create a Separate Project and Link It to the Master
Use this approach when a group of tasks needs its own project file and its updates should appear in the master.
Copying tasks into a new project does not automatically remove them from the original master. Review dependencies, resource assignments, calendars, and custom fields after copying, especially when tasks depend on work outside the selected group.
Open the master in Microsoft Project, expand the relevant summary task, and select its row and all child task rows. Use Copy to copy the selection.
Choose File > New to create a blank project, then paste the selected rows into the task table. Check the task hierarchy and schedule settings.
Choose File > Save As and save the new project as an .mpp file in its intended location.
In the master, select the insertion row and choose Project > Subproject. Select the saved file, ensure Link to project is enabled, and insert it.
Expand the inserted subproject in the master and compare its tasks, dependencies, and assignments with the source. Resolve any duplicate tasks only after confirming which file owns them; edits to linked tasks can affect the linked file.

Unlink Subprojects to Create a Static Master
Use a static master when you need a snapshot that does not update the original subproject files.
Use WPS Office for Project Reports and Supporting Documents
WPS Office is a free, lightweight alternative for working with project reports and spreadsheets in a familiar interface. Its Microsoft Office format compatibility helps teams move supporting documents between applications. It does not manage Microsoft Project master or subproject links.

Frequently Asked Questions
Will changes in a linked subproject appear in the master?
A dynamically linked subproject can show changes from its source file in the master. Keep the file in its expected location and reopen or refresh the master as needed.
How do I stop a subproject from updating the master?
In the master, double-click the subproject summary task, open the Advanced tab, and clear Link to project. The inserted tasks become a static snapshot rather than an automatically updated link.
Does saving a master under a new name copy its subprojects?
No. File > Save As creates a copy of the master file, but its links can still point to the original subproject files. Check those links before editing tasks.
Can I automate rebuilding a static master?
You can record a macro in Microsoft Project to create a master, set its schedule, insert subprojects, and clear their links. Test it with your files and keep subprojects in the locations expected by the macro.