Manage Linked Subprojects and Resource Names in Microsoft Project 2013
Question details
Standardize employee resource names across Project 2013 subprojects without damaging the linked master schedule.

- Product
- Microsoft Project 2013
- Device & OS
- not provided
- Scenario
- A master schedule contains linked subprojects with thousands of tasks, and the files are being moved to a common drive accessed across a WAN.
- Observed behavior
- Resource names are inconsistent across project files, and the user wants to reduce manual renaming while preserving links, assignments, and baselined schedules.
Identify the master file, subprojects, resource pool, cross-project dependencies, and current file locations. Record which resource names should change and whether similarly named records represent the same person; make copies of all related files and test changes in an isolated set with links checked before editing production files.
Standardize employee names in the resource pool and projects
Use this approach for a manageable number of name changes, especially when projects share a resource pool.
A resource pool is a separate file of resources shared by projects; it is not a bulk-renaming tool. If the pool is only used as a template, each project may have its own resource records that need updating.
Renaming a resource record does not automatically merge duplicate records. Check assignments and confirm that each record represents the intended employee before changing it.
Open a subproject and select Resource > Resource Pool > Share Resources to check whether it uses a shared pool or its own resources.
Open the pool or project file and select View > Resource Sheet. Compare the Resource Name entries with your approved employee-name list.
In Resource Sheet, edit the Resource Name cells for the correct employee records. Repeat in project files that contain separate resource records, coordinating access to the shared pool as needed.
Review affected task assignments and cross-project links in the test files, then save and reopen them to confirm the names and connections remain correct.

Batch-update resource names with a tested script
Use VBA or an external script when many project files need the same name corrections.
Protect links when moving subproject files
Use this approach before relocating files or replacing a working schedule in an existing master structure.
Use WPS Office for Resource Lists and Project Documentation
WPS Office is a free, lightweight alternative for everyday office work, with a familiar interface and Microsoft Office format compatibility for a smooth move between applications. Use WPS Spreadsheets to prepare a resource-name mapping and WPS Writer to document the migration plan; linked Microsoft Project schedules still require Project-compatible tools.

Frequently Asked Questions
Can a resource pool rename employees in every project automatically?
A resource pool stores resources shared by projects, but it is not a bulk-renaming tool. Check Resource > Resource Pool > Share Resources in each project; projects with separate resource records may need their own updates.
Will renaming two resource records merge their assignments?
No. Giving records the same name does not automatically merge them. Review the records and their task assignments separately before deciding how to consolidate duplicates.
Can I move a linked subproject to a common drive?
Yes, but first document its master, external dependencies, and resource-pool links. Test unlinking and relinking in an isolated set, then reopen the master and check all references after the move.
Is a WAN a reliable way to maintain linked Project files?
Network interruptions can make linked-file operations risky. Coordinate changes through one maintainer and consider an enterprise scheduling service such as Project Server or Project Online if appropriate and available for your organization.
Can WPS Office repair a Microsoft Project master schedule?
No. WPS Office can help prepare resource-name lists and documentation, but it does not repair Microsoft Project links or update assignments in linked Project schedules.