Resize Task and Timeline Areas in a Microsoft Project PDF
Question details
Make the task table more readable relative to the timeline when printing a Project Gantt chart to PDF.

- Product
- Microsoft Project 2013
- Device & OS
- not provided
- Scenario
- The user wants to print a Gantt chart to PDF with enough space for the task table.
- Observed behavior
- The task table appears too narrow in the PDF, while the timeline occupies most of the page. Settings in the original project file may affect the output.
Open the project in Gantt Chart view and identify the task columns and date range you need in the PDF. Use File > Print to check the preview before changing the layout.
Adjust the Gantt chart layout before printing to PDF
Use column widths, timescale, and page setup to make the task table more readable in the printed chart.
In Gantt Chart view, drag the boundary between column headings to widen important columns or narrow less important ones. Drag the divider between the task table and chart to adjust the on-screen workspace.
On the View tab, use the Timescale controls to choose a coarser or finer interval. In File > Print, check the available date-range settings and limit the printed dates if you do not need the entire timeline.
Go to File > Print > Page Setup. On the Page tab, try Landscape orientation, a larger paper size, or different scaling settings, then check the print preview for readability.
In File > Print, inspect the preview and revise the column widths or scaling if needed. Select a PDF printer, such as Microsoft Print to PDF if available, and click Print.

Try another PDF printer or test a new project
Use this approach if the original file still produces an unreadable PDF after you adjust its print settings.
Use WPS Office for Everyday Documents and PDFs
WPS Office is a free, lightweight alternative for working with common Office files and PDFs in a familiar interface. Open compatible files to make migration easier, though WPS Office does not change Microsoft Project's Gantt chart print settings.

Frequently Asked Questions
Why is the task table so small in my Project PDF?
A wide timeline, narrow task columns, or print scaling can make the table hard to read. Check File > Print, adjust the date range and column widths, and review Page Setup before printing again.
How do I give the task table more space?
In Gantt Chart view, drag column-heading boundaries to change column widths and move the divider between the table and chart. Then check File > Print, because the printed proportions may differ from the on-screen view.
Will a different PDF printer fix the layout?
It may offer different paper or layout options, but Project still controls much of the chart layout. Select the printer in File > Print, check its properties, and compare the output.
What if only one project file prints incorrectly?
Create a small test file with File > New and print it to PDF. If the test looks better, compare the original file's view, column widths, timescale, and Page Setup settings.
Can WPS Office change the Gantt chart layout in Microsoft Project?
No. Adjust the Gantt chart and print settings in Microsoft Project before creating the PDF. WPS Office can be used to view the resulting PDF.