How to Fix Microsoft Planner Task Limit Errors in Power Automate
Question details
The user is experiencing a request-limit error in a Power Automate flow designed to create new Planner tasks from incoming emails.

- Product
- Microsoft Planner and Power Automate
- Device & OS
- not provided
- Scenario
- Running an automated flow to generate Microsoft Planner tasks whenever a specific email arrives.
- Observed behavior
- The Power Automate flow fails with a 'The request exceeded allowed limits' error because the destination Planner plan has reached its 9,000-task capacity.
Check the total number of active and completed tasks in your target Microsoft Planner plan to confirm if you have reached the 9,000-task threshold.
Remove Completed Tasks to Free Up Plan Capacity
The fastest way to resolve the limit error is to manually delete completed or unnecessary tasks from your plan to make room for new ones.
Microsoft Planner imposes a hard limit of approximately 9,000 tasks per plan. This includes both active and completed tasks. Removing older, completed items allows your automated workflows to resume normal operation.
Log into your Microsoft 365 account, navigate to Planner, and open the specific plan where your flow creates tasks.
Click on the 'Filter' option in the top right corner and select 'Completed' to view only the tasks that are finished.
Click the three dots (More options) on a completed task and select 'Delete'. Repeat this process for tasks you no longer need to retain.
Go back to Power Automate, navigate to your flow's run history, select the failed run, and click 'Resubmit' to verify the error is resolved.

Split Work Across Multiple Planner Plans
If you need to keep thousands of active tasks, distribute the workflow load across multiple plans to avoid hitting the single-plan limit.
Enhance Your Daily Workflow with WPS Office
While managing automation limits in Microsoft Planner, consider optimizing your document management. WPS Office is a lightweight, comprehensive productivity suite that seamlessly handles all your daily document needs without heavy subscription fees.
- 1. Download the Installer: Visit the official WPS Office website and download the free installation package for your operating system.
- 2. Install the Suite: Run the downloaded installer and follow the quick on-screen instructions to set up the software.
- 3. Start Creating: Launch WPS Office to instantly open, edit, and save your existing Microsoft Office files without formatting loss.

Frequently Asked Questions
What is the maximum number of tasks a Microsoft Planner plan can hold?
A single Microsoft Planner plan can hold approximately 9,000 tasks in total. This limit includes both active and completed tasks within the plan.
Why does my Power Automate flow return a 'request exceeded allowed limits' error?
This error generally occurs when the target service has reached its capacity limit. In the context of Planner, it means the plan has hit the 9,000-task threshold, preventing Power Automate from creating new tasks.
Can I automatically delete completed Planner tasks to avoid hitting the limit?
Yes. You can build a scheduled Power Automate flow that periodically lists tasks in a specific plan, filters for those marked as completed, and deletes them automatically to free up space.




